today we feel very happy because we get a job back in the cold city (takengon) aceh. today we work like normal days where in a day we can get work done at several different points and different tasks as well.
I will also explain one by one my work which is in some of the photos posted tonight.
this first point is a very dangerous triangle PLEASE DON'T IMITATE. our first task is to replace a fulcrum ISOLATOR, surely some of you don't know what a fulcrum ISOLATOR is? The pedestal insulator is the one that carries the heavy load of the conductor when the electric current conductor is installed on it, so that it is easy to understand from the function of the ISOLATOR, the insulator functions as a cable hook from one pole to another.
This insulator also includes one part that often has problems, especially the position of the pole in a place where there are many tall trees around it and often fall.
proceed to the installation of TRAVERS, travers or what is known as the cross arm is a component that functions as an insulator seat, the cross arm is made of high quality material, although it looks like ordinary mild steel but it is not so.
We did this cross arm installation after the concrete pole was installed perfectly, but I don't have a photo when installing this pole because we did this pole installation one week ago, it was hampered by the rainy season and strong winds in this area which required us to stop work for a few days .
after the cross arm installation was completed we decided to take a short break to plan a plan for the next several points.
after a break we immediately continued work to the next point where we would install a new pole and cross ar (one set) here we were a little hampered because of the pole installation point, the soil conditions were not so good for a concrete pole of this size, after discussing with the group leader us, and we decided to dig deeper into the ground for the installation of this pole because of the soil conditions like this.
five o'clock in the afternoon arrived and we decided to stop continuing our work today, while waiting for the team to check the feasibility of using it, we also rested while enjoying the cool air in this cold city area.