How to get better concrete

Hello friends, my experience in construction allows me to give some advice when it comes to building and this time today I am going to talk about concrete, and how to obtain a better result according to my experience.

So the optimal or minimum is to cure the concrete for seven days, there is a curious fact that in concrete cured for 28 days, which is the number of days in which concrete reaches the greatest resistance, it has been observed that they reach 25 percent more than the resistance that was expected and as this is known, because breakage tests are carried out on specimens.

One method that I use is to place a reservoir with a hole in it so that the element is always on its surface.
Another factor that must be taken into account is the climate. Studies have been carried out in geographical regions with a humid climate where it has been observed that natural curing may occur without the need for special actions, but this could only occur if the humidity of the environment is 80% during most of the day, which would prevent the movement of the water inside the concrete to the outside, but you have to forget about this since these conditions are very specific and casual, in short you have to cure the concrete wherever you are, which is very necessary.

Understanding how important the curing of concrete is, it must be done with the best technique, the most used method is to water with a hose so that this surface remains moist, care must be taken that the water pressure is not too high at first because the concrete was still fresh and it could wash the surface of the concrete and we don't want that; I use the method described in the image combined with other methods.

Another method that does not require the addition of water to the surface is to cover it with waterproof insulation, this prevents the mixing water from escaping from the concrete mass by evaporation, this is achieved by placing plastic sheets on the surface. surface and although the water evaporates because these sheets do not allow water to escape in large quantities, thus ensuring that the concrete maintains the degree of humidity it needs for curing, polystyrene sheets or any other sheet can be placed, this can be applied method in conjunction with the previous one, placing wet cloths and on top of these plastic sheets plus a reservoir of water, this would be the best.

It must be avoided at all costs that the water in the concrete migrates, if this happens, cavities and cracks are formed, weakening the concrete.

It must be avoided at all costs that the water in the concrete migrates, if this happens, cavities and cracks are formed, weakening the concrete.
I hope the information is useful when making a decision, do not forget to support me and we will read next time, bye.