Main line is ran into the new box.
Got the silicone covers over the mains and house wires pulled inside.
Those are just the cables from the top, here is a view what's left outside and goes in next.
House is wired into the new box finally! Power was down 6 hours.
Now it's time to install the server and Mining room power supply plugs, stay tuned