
ENT Wallet download - http://ent.eternity-group.org/
MMR - https://www.miningrigrentals.com/
AltMiner.net - https://www.altminer.net/
Coinbase.com - https://www.coinbase.com/
Quick and simple to the point on how to Rent a mining rig on MiningRigRentals.com. Today we are going to rent a x11 Rig and mine Eternity (ENT - x11) and use the pool AltMiner.net.
First thing we need to do is add some money to MRR - i all ready have LTC on my account but im still going to show you how to transfer some LTC over.
Fist go to coinbase.com - login and or make a account.
Im going to buy $10.00 of litecoin - 0.06533197 LTC
After buying LTC it should be in your account after 6+ confirmations.
Now we need to send the LTC over to MMR .
Go to MMR.com - on the top right click on your user name and then click on balance.
Go to deposit address - Litecoin LTC - in operation panel - add a lable name i put Mining Dep. and click on Create new address
Copy your address and login into your coinbase account - go to account - click on LTC - send added the MMR ltc addres and click max amount in the usd box.
Yay! now we have send some LTC to MRR. we are almost done.
After sending LTC it should be in your account after 3+ confirmations.
Lets pick a mining pool- im going to use AltMiner.net
Here you have all your pool info like the pool address and what coins are on the pool.
Now its time to setup the pool info
Click on your account name and go to pool profiles
Click on Create New Profile and fill out the profile pool and set the algo to x11
under add existing pool select add a new pool
Here are my settings for my pool info.
Name - The Name of your pool - i put x11 - ENT Altminer.net
Pool Host - your pool url you dont need to add the strturm all ready add by MRR
Workername - your workername is going to be your ENT wallet address
Password - Some pools don't need a password so just put x - now on Almminer.net you need to put d=difficulty so the required on some mining pools and rentals if your using a asic - if your using a GPU or CPU then for this pool you need to put C=coin(e.g ENT)
Notes - Dont have to put anything here.
Now i got a error message when i was done with the setup of the rental.
I had to change the password from C=ENT to D=40 because the difficulty is to low.
Ok now your asking me how do i get a ent address. First you need to go to the ENT website and download the wallet.
Buy clicking on Receive - adding a label (Mining) - And clicking on show you can get your address.
time to pick out your rig!
Go to rig at the top and click on x11 - or any other rig you want.
!
Now becouse we are using ltc to buy a rig make sure you click on pay with LTC.
The First rig is going to be the cheapest but also you want to look at the RPI.
"RPI, or Rig Performance Index, is an algorithm that indicates how stable the rig has been performing. RPI is a metric for both rig owners and renters. There are a few situations that effect RPI, if the rig goes offline frequently, or the advertized rate is too high, or otherwise cheating on hashrate. It is designed to indicate that they may need to address rig power, internet or stability issues, as well as review their rig's hashrate setting on their MRR page. Please note that RPI scores are calculated at the rig performance level, not the renter performance level. The score ranges from 0-100, with 90-100 being the best possible score."
Then you have your Hashrate - KH/s - MS/s - GH/s - TH/s
Price Per GH Per Day
Min Rental hours
Max Rental Hours
And if it available or not.
Hash rate denominations
1 kH/s is 1,000 (one thousand) hashes per second
1 MH/s is 1,000,000 (one million) hashes per second.
1 GH/s is 1,000,000,000 (one billion) hashes per second.
1 TH/s is 1,000,000,000,000 (one trillion) hashes per second.
Conversions
1 MH/s = 1,000 kH/s
1 GH/s = 1,000 MH/s = 1,000,000 kH/s
1 TH/s = 1,000 GH/s = 1,000,000 MH/s = 1,000,000,000 kH/s
and so forth
Pick the rig you want and click on Rent now
NOTE* this is not the rig i picked - I rented one for 5 Hours.
Put in the amount of hours you want to rent for - Then click on Rent now.
Now we need to add the pool to the rental you want to rent and then click pay
Select the x11 pool that we added and then click on apply profile.
and now your done! Give the miner some time before you contact the seller if its not showing up on the mining pool
Also Check your settings for your pool and make sure the settings are right.
If we go to altminer.net and click on wallet and added our ENT address
We can track the Miner live and see how much we are getting paid out.
Donate LTC : LaL4meHvGgdweFurbv9ESgY2mtGdLBH67P