The mid-to-low-speed magnetic levitation track is 10 km long and connects two of Beijing’s subway lines, Line 1 and Line 6. The maglev train line, named S1 Line, will open by the end of this year, with 8 stations on a 20-minute trip.
The mid-to-low-speed magnetic levitation track is 10 km long and connects two of Beijing’s subway lines, Line 1 and Line 6. The maglev train line, named S1 Line, will open by the end of this year, with 8 stations on a 20-minute trip.